中国地下污水处理厂数据表
时间区间
根据建设年份统计,为1995-2024
字段展示
中国地下污水处理厂数据表_英文字段 | 中国地下污水处理厂数据表_中文字段 |
---|---|
Type_WWTP | 类型_污水处理厂 |
Name_WWTP | 名称_污水处理厂 |
Local_province | 省份 |
Local_city | 城市 |
Local_lon | 经度 |
Local_lat | 纬度 |
Scale_WWTP | 规模_污水处理厂(104m3/d) |
Process_category | 工艺类别 |
Process_category-specific | 工艺类别具体 |
Discharge_standard_WWTP | 污水处理排放标准 |
Sample_COD | 污水中化学需氧量的年平均浓度(mg/L) |
Sample_NH3-N | 污水中氨氮(NH3-N)的(mg/L) |
Construction_Year | 建设年份 |
Source | 来源14个指标 |
样本数据
Type_WWTP | Name_WWTP | Local_province | Local_city | Local_lon | Local_lat | Scale_WWTP | Process_category | Process_category-specific | Discharge_standard_WWTP | Sample_COD | Sample_NH3-N | Construction_Year | Source |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
类型_污水处理厂 | 名称_污水处理厂 | 省份 | 城市 | 经度 | 纬度 | 规模_污水处理厂(104m3/d) | 工艺类别 | 工艺类别具体 | 污水处理排放标准 | 污水中化学需氧量的年平均浓度(mg/L) | 污水中氨氮(NH3-N)的(mg/L) | 建设年份 | 来源14个指标 |
semi-UWWTP | Ha Er Bin Qun Li WWTP | Hei Long Jiang | Ha Er Bin | 126.541615 | 45.808826 | 25.0 | Biofilm | CASS-MBBR | Class 1A | 2019 | Consultation, Public Information | ||
full-UWWTP | Chang Chun Bei Hai Shi Di WWTP | Ji Lin | Chang Chun | 125.330602 | 43.821954 | 5.0 | MBR | AAO+MBR | Above Class 1A | 2018 | Consultation, Public Information | ||
full-UWWTP | Chang Chun Bei Shi Tiao UWWTP | Ji Lin | Chang Chun | 125.330602 | 43.821954 | 3.0 | Biofilm | MBBR | Above Class 1A | 2018 | Consultation, Public Information | ||
full-UWWTP | Da Lian Lv Shun Xiao Gu Shan WWTP | Liao Ning | Da Lian | 121.621631 | 38.918954 | 3.0 | MBR | AAO+MBR | Above Class 1A | 2016 | Consultation, Public Information | ||
semi-UWWTP | Da Lian Si Dong Gou WWTP | Liao Ning | Da Lian | 121.621631 | 38.918954 | 7.0 | Biofilm | BAF | Class 1A | 2011 | Consultation, Public Information | ||
full-UWWTP | Zheng Ding Xin Qu UWWTP | He Bei | Shi Jia Zhuang | 114.521532 | 38.048312 | 10.0 | MBR | AAO+MBR | Class 1A | 2015 | LI Yifeng & LI Hang. Development status and discussion of underground wastewater treatment plants in China and abroad. in 308–315 (China Civil Engineering Society, 2019) | ||
full-UWWTP | Xiong An Xin Qu Rong Dong Pian Qu WWTP | He Bei | Bao Ding | 115.471464 | 38.879988 | 4.0 | AAO | AAO | Above Class 1A | 2021 | Consultation, Public Information | ||
full-UWWTP | Xiong An Xin Qu Zan Gang WWTP | He Bei | Bao Ding | 115.471464 | 38.879988 | 3.0 | AAO | AAO | Above Class 1A | 2021 | Consultation, Public Information | ||
semi-UWWTP | Men Tou Gou Qu Di Dong WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 8.0 | MBR | AAO+MBR | Class 1A | 2018 | DUAN Y L, CHEN H Y & LI Y S. Construction Mode and Prospect Analysis of Domestic Underground Wastewater Treatment Plants. Water Purification Technology 39, 34–39 (2020). | ||
full-UWWTP | Bei Jing Huai Fang WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 60.0 | MBR | AAO+MBR | Class 1A | 2016 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019).ZHANG Yun et al. Present status and development tendency of underground water and wastewater treatment plants. Water& Wastewater Engineering 59, 39-46+59 (2023). | ||
full-UWWTP | Bei Jing He Dong WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 6.0 | MBR | MBR | Class 1A | 2023 | Consultation, Public Information | ||
semi-UWWTP | Xiao Jia He WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 8.0 | MBR | AAO+MBR | Above Class 1A | 2016 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019).Giwa, A. S. & Ali, N. An Extensive Analysis of the Engineering Design of Underground Sewage Plants in China. Processes 11, 3010 (2023) | ||
full-UWWTP | Tong Zhou Bi Shui WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 18.0 | AO | Multiple AO | Above Class 1A | 2017 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
full-UWWTP | Dao Xiang Hu WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 8.0 | AO | Multiple AO | Class 1A | 2016 | Giwa, A. S. & Ali, N. An Extensive Analysis of the Engineering Design of Underground Sewage Plants in China. Processes 11, 3010 (2023)HAO, X. D., YU, W. B., WANG, X. Y., YUAN, T. G. & Mark van Loosdrecht. Life Cycle Comprehensive Efficiency Assessment on Underground Wastewater Treatment Plant. China water & wastewater 37, 1–10 (2021)Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
semi-UWWTP | Tian Tang He WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 8.0 | MBR | AAO+MBR | Class 1A | 2016 | QIU W. The Current Status and Prospect of Underground Wastewater Treatment Plant in China. China water & wastewater 33, 18–26 (2017).Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
semi-UWWTP | Wei Lai Ke Ji Cheng WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 8.0 | AAO | AAO | Above Class 1A | 2014 | Consultation, Public Information | ||
full-UWWTP | Shang Zhuang WWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 1.2 | MBR | MBR | Above Class 1A | 2019 | Consultation, Public Information | ||
full-UWWTP | Chang Ping TbdWWTP | Bei Jing | Bei Jing | 116.413384 | 39.910925 | 10.0 | MBR | AAO+MBR | Class 1A | 2020 | Consultation, Public Information | ||
semi-UWWTP | Dong Jiao WWTP | Tian Jin | Tian Jin | 117.208093 | 39.091103 | 60.0 | AO | Multiple AO | Above Class 1A | 2020 | Consultation, Public Information | ||
full-UWWTP | Tai Yuan Jin Yang WWTP | Shan Xi | Tai Yuan | 112.556391 | 37.876989 | 48.0 | MBR | AAO+MBR | Class 1A | 2017 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019).HAO, X. D., YU, W. B., WANG, X. Y., YUAN, T. G. & Mark van Loosdrecht. Life Cycle Comprehensive Efficiency Assessment on Underground Wastewater Treatment Plant. China water & wastewater 37, 1–10 (2021) | ||
full-UWWTP | Qing Dao Gao Xin Qu WWTP | Shan Dong | Qing Dao | 120.389455 | 36.072227 | 9.0 | MBR | MBBR | Class 1A | 2014 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
full-UWWTP | Qing Dao Zhang Cun He WWTP | Shan Dong | Qing Dao | 120.389455 | 36.072227 | 4.0 | MBR | MBR | Above Class 1A | 2019 | Consultation, Public Information | ||
semi-UWWTP | Qing Dao Shi Yuan Hui WWTP | Shan Dong | Qing Dao | 120.389455 | 36.072227 | 0.6 | MBR | MBR | Others | 2015 | Consultation, Public Information | ||
full-UWWTP | Qing Dao Lao Shan Qu Sha Zi Kou WWTP II | Shan Dong | Qing Dao | 120.389455 | 36.072227 | 5.5 | MBR | AAO+MBR | Others | 2025 | Consultation, Public Information | ||
full-UWWTP | Lin Yi Qing Long He WWTP | Shan Dong | Lin Yi | 118.363533 | 35.110671 | 8.0 | AAO | AAO | Class 1A | 2017 | Consultation, Public Information | ||
full-UWWTP | Lin Yi Da Xue Cheng WWTP | Shan Dong | Lin Yi | 118.363533 | 35.110671 | 2.3 | SBR | CAST | Class 1A | 2015 | Consultation, Public Information | ||
full-UWWTP | Ji Nan Guo Ji Yi Xue Ke Xue Zhong Xin WWTP | Shan Dong | Ji Nan | 117.126399 | 36.656554 | 5.0 | AAO | AAO | Class 1A | 2023 | Consultation, Public Information | ||
full-UWWTP | Ji Nan Qi Bu Qu Cui Zhai WWTP I | Shan Dong | Ji Nan | 117.126399 | 36.656554 | 4.0 | MBR | AAO+MBR | Class 1A | 2023 | Consultation, Public Information | ||
full-UWWTP | Ji Nan Dong Zhan Pian Qu WWTP | Shan Dong | Ji Nan | 117.126399 | 36.656554 | 10.0 | MBR | AAO+MBR | Class 1A | 2020 | Consultation, Public Information | ||
semi-UWWTP | Ji Nan Tang Ye WWTP I | Shan Dong | Ji Nan | 117.126399 | 36.656554 | 2.5 | MBR | AAO+MBR | Class 1A | 2020 | Consultation, Public Information | ||
full-UWWTP | Ji Nan Hua Shan WWTP | Shan Dong | Ji Nan | 117.126399 | 36.656554 | 3.0 | MBR | AAO+MBR | Above Class 1A | 2018 | Consultation, Public Information | ||
semi-UWWTP | Yan Tai Tao Zi Wan WWTP II | Shan Dong | Yan Tai | 121.454415 | 37.470038 | 15.0 | MBR | AAO+MBR | Class 1A | 2016 | XIA, Y. F. et al. Application of AAO + MBR Processes in Underground Wastewater Treatment Plant (UWWTP). Water Purification Technology 41, 140–145 (2022)Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
full-UWWTP | Yan Tai Gu Xian WWTP | Shan Dong | Yan Tai | 121.454415 | 37.470038 | 2.0 | AAO | AAO | Class 1A | 2014 | Sun, S. et al. Underground sewage treatment plant: a summary and discussion on the current status and development prospects. Water Science and Technology 80, 1601–1611 (2019). | ||
full-UWWTP | Ji Mo Qu Bei Bu WWTP | Shan Dong | Qing Dao | 120.389455 | 36.072227 | 6.0 | AO | Multiple AO | Class 1A | 2023 | Consultation, Public Information | ||
full-UWWTP | Wu Xi Bei Jian Gong Yuan WWTP | Jiang Su | Wu Xi | 120.318583 | 31.498810 | 10.0 | MBR | AAO+MBR | Others | 2025 | Consultation, Public Information | ||
full-UWWTP | Xu Zhou Kui He UWWTP | Jiang Su | Xu Zhou | 117.290575 | 34.212667 | 20.0 | AAO | AAO | Above Class 1A | 2024 | Consultation, Public Information | ||
full-UWWTP | Su Zhou Gao Xin Qu UWWTP | Jiang Su | Su Zhou | 120.592412 | 31.303564 | 10.0 | AAO | Modified AAO | Class 1A | 2020 | Consultation, Public Information | ||
other-UWWTP | Su Zhou Gong Ye Yuan Qu Di Dong WWTP | Jiang Su | Su Zhou | 120.592412 | 31.303564 | 3.6 | MBR | MBR | Above Class 1A | 2013 | QIU W. The Current Status and Prospect of Underground Wastewater Treatment Plant in China. China water & wastewater 33, 18–26 (2017). |
数据更新频率
年度更新